Your solar questions, answered
Everything homeowners and businesses ask us before going solar, in plain language.
Cost & Savings
Residential on-grid rooftop solar typically costs ₹55,000–65,000 per kW before subsidy. A 3 kW home system costs roughly ₹1.7–2.1 lakh, and the PM Surya Ghar subsidy of up to ₹78,000 brings the effective cost down significantly.
Residential systems usually pay back in 3–5 years after subsidy, while commercial systems pay back in 3–4 years. After that, the electricity is essentially free for the remaining 20+ years of panel life.
If your system is sized to cover your full consumption, your energy charges can drop close to zero. Fixed charges and taxes set by your DISCOM usually remain.
Yes. Public-sector banks offer collateral-free solar loans at around 7% p.a. under PM Surya Ghar for systems up to 3 kW, and we also work with private financiers for no-cost EMI options.
Subsidy & Approvals
Residential consumers get ₹30,000 per kW for the first 2 kW and ₹18,000 for the 3rd kW, capped at ₹78,000 for systems of 3 kW or more. The subsidy is credited directly to your bank account after commissioning.
Any Indian household with its own house, a valid electricity connection and a suitable roof is eligible, provided it has not availed any other solar subsidy before. Only DCR (made-in-India cell) panels qualify.
The PM Surya Ghar subsidy is only for residential consumers and Resident Welfare Associations / Group Housing Societies. Businesses benefit instead from accelerated depreciation and lower tariffs.
Once your system is installed, inspected and the net meter is commissioned, the subsidy is usually credited within 30 days of submitting bank details on the national portal.
Technical
In most parts of India, 1 kW of solar panels generates about 4 units (kWh) per day, or roughly 1,400–1,500 units a year, depending on location, tilt and shading.
Net metering lets you export surplus solar power to the grid through a bi-directional meter. Exported units are adjusted against the units you import, so you only pay for the net consumption.
You need about 80–100 sq ft of shadow-free roof area per kW. A typical 3 kW home system needs around 250–300 sq ft.
Yes, but at reduced output, typically 10–30% of normal on heavily overcast days. Annual generation estimates already account for the monsoon season.
Both are monocrystalline technologies. TOPCon is newer, offers slightly higher efficiency (22%+), better low-light performance and lower degradation than PERC.
Installation & Service
Quality solar panels last 25–30 years. Tier-1 panels carry a 25-year performance warranty guaranteeing around 80–87% of rated output at the end of that period.
A home system is installed in 1–2 days. Commercial plants take 1–6 weeks depending on size. Net-meter commissioning by the DISCOM usually adds 2–4 weeks.
We use chemical anchoring and waterproof sealing on RCC roofs, or ballast/non-penetrating structures where needed, so your roof remains leak-free.
Mainly regular cleaning with water and a soft brush every 2–4 weeks, plus an annual electrical check. Our AMC plans cover both.
Ready to switch to solar? Let's connect.
Book a free site survey. Our engineer will visit, assess your roof and share a transparent proposal with savings and subsidy details.