
Components built to last 25 years
We only install BIS-certified, ALMM-listed equipment from bankable manufacturers, and we tell you exactly which brands go on your roof.
Solar Panels
ALMM-listed, BIS-certified modules from Tier-1 Indian and global manufacturers. DCR panels for subsidy projects.

Mono PERC
540–555 Wp · ~21.3% efficiency
Proven, cost-effective choice for homes
TOPCon (n-type)
570–590 Wp · ~22.5% efficiency
Better heat & low-light performance
Bifacial
Up to +10% rear-side gain
Ideal for elevated & ground-mount plants
DCR Panels
Made-in-India cells
Mandatory for PM Surya Ghar subsidy
Inverters
Grid-tied, hybrid and off-grid inverters with Wi-Fi monitoring and 5–10 year warranties.

On-grid string inverters
1 kW – 250 kW
Dual MPPT, IP65, app monitoring
Hybrid inverters
3 kW – 15 kW
Seamless battery backup + net metering
Off-grid PCUs
1 kVA – 10 kVA
For areas with no reliable grid
Solar pump controllers
1 HP – 10 HP
AC/DC with remote monitoring
Batteries
Storage that keeps essential loads running through outages, sized for your backup hours.

Lithium (LFP)
5 – 15 kWh · 6,000 cycles
Maintenance-free, 8–12 year life
Tubular lead-acid
150 – 200 Ah
Budget backup, needs water top-up
Wall-mount packs
Stackable modules
Start small, expand later
Commercial BESS
50 kWh+
Peak shaving & DG replacement
Structures & BOS
The parts that decide whether a plant lasts 25 years: structure, cabling, protection and earthing.

Hot-dip galvanised structures
80–120 micron coating
Rust-proof, wind-load tested
Solar DC cables
4 / 6 sq mm, UV-rated
TÜV / IS-certified copper
ACDB / DCDB
SPD, MCB, isolators
Complete surge protection
Earthing & LA
Chemical earthing
Lightning arrestor on every system
Not sure which components suit you?
Our engineers will recommend the right panel, inverter and battery combination for your roof and budget.

